Overall capabilities to perform the work, including available workforce to assign
submit a Letter of Qualification and one unpriced prospectus to Mr. William
Post Design Services, if required, will be by separate agreement. A completed copy of the Divisions Consultant Confidential Qualification Questionnaire, if not already on file, dated January 1, 2019 or later. NEPA will be performed by WVDOH. Additional services to be performed include geotechnical services. Notice is hereby given by the West Virginia Department of Transportation, Division of Highways, that consulting services will be utilized to produce contour mapping from aerial photography performed by others. 1 Survey Crew/Services, Notice is hereby given that consulting services will be utilized by the West Virginia Department of Transportation, Division of Highways, for Quality Control and Quality Assurance project inspection, documentation services, project management, and related duties as required on the WV 622 Cross Lanes project (Kanawha County). audited overhead rate computation performed by a State or Federal government
Notice is hereby given that consulting services will be utilized by the West Virginia Department of Transportation, Division of Highways, for project management, project inspection, quality assurance, documentation services, and related duties as required on various construction projects throughout the State. firms may be selected for this work. WV 131 BENEDUM DR WIDENING, located in Harrison County, West Virginia. WVDOH WVDOH WV DOH Announces Upcoming Highway Project Colonel Ruby Bradley Bridge Spencer, WV U344-33-12.76 00 The Colonel Ruby Bradley Bridge is located on US 33 over Spring Creek. This list of prequalified Consultants will be made available on the WVDOH website. Notice is hereby given by the West Virginia Department of Transportation, Division of Highways (DOH) is soliciting qualifications for the purpose of making available a list of pre-qualified Consultants to be utilized for providing all types of surveying including, but not limited to, conventional, GPS, Remote Sensing, Hydraulic and Hydrology, as well as Subsurface Utility (SUE) at various locations throughout the State for highway, bridge or miscellaneous projects. eliminations and references. Environmental services are being performed by others and are not anticipated to be included in this project.
Location of office in which the
Project B
State Project U336-33-1.43 00, Allegheny Truck Escape Ramp, located in Pendleton County, West Virginia. The work generally consists of collecting volume, classification, weight, and speed data. 2 - Level 2
Successful Consultants must be capable of performing 51% of the work as the prime Consultant. Consultant shall submit for approval a resume of qualifications of the
As a minimum, the prospectus shall include the following evaluation information factors:
and references. 1 CPM Schedule Reviewer
Overall capabilities to perform the work, including available workforce to assign to the project, workforce personnel qualifications, and present workload. MEETINGS. Further project details are located at. The anticipated duration of the agreement is approximately 48 months. Contractors Association of West Virginia | WVDOH Lettings It is anticipated that appropriately accredited and qualified inspectors, Levels I-IV, for the area of assignment will be required. information may be obtained on each bridge by contacting William Murray, Operations
continuous girders spans, one three-span continuous girder span, one six-span
The roadway width is 28 feet. other parts of the prospectus is not acceptable. Notice is hereby given that consulting services will be utilized by the West Virginia Department of Transportation, Division of Highways, for Quality Assurance Management (QAM) services and related duties as required for the upgrade of US 35 from WV 869 to Mason CR 40 in Putnam and Mason Counties, West Virginia. Bridge Inspection services provided shall be in accordance with Occupational
CHARLESTON, W.Va. (WSAZ) -- A project widening WV 622 through the most congested part of Cross Lanes is among 34 projects included in a bid letting . This project shall consist of preparation of contract plans related to widening the subject road for a center two-way left-turn lane, shoulders, and sidewalks. The purpose of this Request for Qualifications (RFQ) is to solicit letters of interest and qualifications from firms interested in providing the services described in this RFQ. 7. S310-60-0.32 00, Smithers Creek Bridge, located in Fayette County, West Virginia.The bridge carries US 60 over Smithers Creek and Bridge Street (CR21/15) in Smithers, West Virginia.The existing bridge is 147 feet long by 38 feet wide and is located 0.06 of a mile east of CR 2. importance being given to accessibility of the office location relative to the
The special counts are to be collected year around as requested. The SRP is intended to cover a twenty- (20) year planning horizon through the performance of the following work: 1) collect available data for and conduct an asset inventory of all Class I and short line railroads in the State; 2) perform analyses of the market, feasibility, capacity, and cost for potential new intercity passenger or High-Speed Rail (HSR) corridors, as well as existing and potential commuter corridors; 3) perform economic impact analyses of existing and potential tourist train corridors; and 4) develop methods that WVDOT may use in the future to analyze the feasibility, costs and benefits of potential rail corridors and projects throughout the State. Bids for Appraisal Services and AppraisalReview Servicesfor State Project S343-50/34-0.11 00, Federal Project BR-5034(002)D. Bids for Appraisal Services and Appraisal Review Services for State Project U306-10-1.46, Federal Project STP-0010(199)D, and Second Appraisals and Appraisal Review Services for State Project S323-10-16.20 00, Federal Project EOAP-0010(213)D and State Project S323-10-12.56 00, Federal Project TCSP-0010(202)D. Bids for Appraisal Services and Appraisal Review Services, Specialty Timber and Coal Valuation for State Project S323-10-12.56 00, Federal Project TCSP-0010(202)D. Bids for Specialty Mineral Valuation (Coal)for State Project X47-H-66.85, FederalProject APD-0484(184)C, and Bids for Appraisal Services for State Project X47-H-66.85, FederalProject APD-0484(184)C. Bids for Specialty Merchantable TimberValuation andSpecialty Mineral Valuation (Coal)for State Project X355-121-16.65, FederalProject HPP-0121(013). $206,940,000.00, Skanska USA Civil Southeast, Inc.
WVDOT personnel, management of the research project selection process, management of
The structure carries Gilmer County Route (CR) 17/8 over Cedar Creek and is located approximately 0.06 mile south of CR 17. Location shall be based on the geographic location of the Consultants office relative to the project site along with past experience and knowledge of the area where the project site is located with the significant importance being given to accessibility of the office location relative to the Department. Division, that consulting services will be utilized for Program Management of the Departments
The anticipated duration of the agreement is approximately 30 months beginning in June 2020. You can complete this project for $3198. Firms interested in being considered for these projects must submit a Letter of Qualification and one unpriced prospectus to Mr. William R. Murray, P. E., Bridge Preservation Section Manager, Operations Division, Division of Highways, by email to DOHMaintenanceLOQ@wv.gov prior to 4:00 p.m. on May 31, 2020. The work will generally consist of Section 106 documentation and related work including identification surveys, evaluations for National Register eligibility, and data recovery projects for historic and archaeological resources. This project shall consist of Consultant Services for the design and production of structure plans and related documentation for four dual structures (both northbound and southbound) carrying United States Route (US) 48 along the Hardy County Route (CR) 23/12-VA State Line section of Corridor-H. 1 - Level 1, Notice is hereby given that consulting services will be utilized by the West Virginia Department of Transportation, Division of Highways, for Quality Control and Quality Assurance project inspection, documentation services, project management, and related duties as required on the Mountain View to Gilbert in District 2 Mingo County. knowledge of the area where the project site is located with the significant
The following roads in north central West Virginia are on the list of 2023 revenue surplus programs: Harrison County - $3,815,000 CO 20/3 - Little Elk Rd. No. indicating this certification was previously submitted and accepted by the
Bids for Appraisal Services for State Project PM90-8-RAND-6,Lease No. lanes of traffic with overall width of 33 feet. Post Design Services, if required, may be by separate Agreement. Kokosing
Manual (BIRM), AASHTO Manual for Bridge Evaluation, West Virginia Department of
$189,292,000.00, Archer Western Contractors
No document submission will be accepted beyond the
The submitted certified
Any technical questions concerning the requirements for this project should be directed to Mr. James M. Colby, Contract Administration Division, at (304) 558-9667 or E-mail at mailto:james.m.colby@wv.gov . ReBid for Appraisal Services for State Project S341-3-23.60, FederalProject BR-0003(109)D. Bid for Appraisal Services for State Project X347-H-64.85, Fed. Notice is hereby given that the West Virginia Department of Transportation, Division of Highways (DOH) is soliciting qualifications for the purpose of making available a list of pre-qualified Consultants to be utilized to provide engineering services for roadway, bridge, and miscellaneous highway-related projects. The project will be developed in two phases. 2022 Statewide paving program, real time map announced - WVNS
Statewide interstate and ramps which include volume and classification counts. State Project S312-48-8.69. Williamstown-Marietta Interstate Bridge, Wood County, carrying Interstate 77 over the Ohio River, Wood County Route 1 and CSX Railroad. in whole or in part with Federal funds. This form may be found on the follow website: www.transportation.wv.gov/highways/engineering/Pages/. Post Design Services, if required, may be by separate Agreement. Any potential subconsultant must be included on the list of prequalified Consultants for the applicable Prequalification Category (Engineering Division). highway, and one set of railroad tracks. The anticipated duration of the agreement is approximately 30 months. Notice is hereby given that consulting services will be utilized by the West Virginia Department of
Notice is hereby given by the West Virginia Division of Highways (WVDOH), Planning Division, that consulting services will be utilized to provide services for the preparation of the West Virginia Department of Transportation (WVDOT) Multi-modal Statewide Transportation Plan (Plan). 2 - Level 3
Notice is hereby given by the West Virginia Division of Highways, Planning Division, that consulting services will be utilized for non-traditional transportation projects including federal aid funded projects for the Transportation Alternatives and Recreational Trails programs as well as similarly state funded projects. These services may include surveying, preliminary engineering, relevant environmental documents and analyses, final design, construction engineering/management, and/or inspection services. Consideration shall be given to specialized experience and technical competence. The West Virginia Department of Transportation, Division of Highways (DOH) seeks to construct US 35 from WV 869 in Putnam County to CR 40 in Mason County on new location using a Public-Private Partnership/Design-Build procurement method. Survey & Mapping data will be provided to the Consultant, but additional services may be required. Notice is hereby given that consulting services will be utilized by the West Virginia Department of Transportation, Division of Highways, for project management, project inspection, quality assurance, documentation services, and related duties as required on various construction projects throughout the State. Successful Consultants must be capable of performing 51% of the work as the prime Consultant. The Consultant shall perform all related environmental surveys and documentation required to the complete NEPA process and obtain environmental clearance. span and a main river crossing span (Span Ten). Services shall consist of the preparation of a Design Study, geotechnical information for design, and other PIE project specific tasks as assigned. completed West Virginia Division of Highways, Consultant Confidential
Any potential subconsultant must be included on the list of prequalified Consultants for the applicable Prequalification Category (Engineering Division). This work shall be performed under a Statewide (On-Call) Agreement. T635-70-0.42 00, over the Ohio River. The purpose of this Request for Proposals (RFP) is to solicit Technical and Cost Proposals from prequalified design-build teams interested in providing the services described in this RFP. This evaluation may be accomplished by drilling, sampling, testing and other approved methods. All evaluation factors as noted herein before will be given equal consideration in the selection process, unless a project specific weighting of the evaluation factors is shown in the Notice for Consulting Services. Location of office or office(s) in which the work, or part of the work, will be performed. In such instances, a company computed
As a minimum, the firm shall provide a Rsum of those individuals who will be committed to the needs of the project. Provide Highways with sampling and inspecting materials for highway and bridge construction; inspecting fabricated projects; inspecting timber & lumber: and performing or witnessing non-destructive testing of weldments at structural steel fabrication shops, at locations to be designated by Highways. T619-9-13.53 00, over the Shenandoah River. ** PLEASE BE AWARE OF REVISIONS HIGHLIGHTED WITHIN THE AD BELOW ** 9/12/18
width varies from about 25' to about 50'. Any potential subconsultant must be included on the list of prequalified Consultants for the applicable Prequalification Category (Engineering Division). (EN) FEDERAL PROJECT NHPP0484117
Indication of whether a cost accounting system has been maintained and is in effect such that it is capable of segregating and identifying accumulating costs for each job that is performed under cost type projects. The data collection may include, but not necessarily be limited to: roughness, rutting, faulting, pavement cracking, shoulder type and width, global referencing data, digital roadway images and highway centerline geometrics. performance schedules. Notice is hereby given that the West Virginia Department of Transportation, Division of Highways (DOH) is soliciting qualifications for the purpose of making available a list of pre-qualified Consultants to be utilized to provide noise analysis services for compliance with highway traffic noise prediction requirements, noise analyses, noise abatement criteria as contained in revised Title 23 U S Code of Federal Regulations Part 772 ( 23 CFR 772 ), Procedures for Abatement of Highway Traffic Noise and Construction Noise effective July 13, 2011. the state, over a variety of water conditions, and will be designated by the
Six Year Inspection Project for
shall be located within the office where the work is to be performed and shall
A design study is currently being performed by the Initial Design Section of Engineering Division and will be provided, for information, upon completion. It is possible for multiple Consultants to be selected for each District throughout the State. The Consultant shall perform all related environmental surveys and documentation required to complete the NEPA requirements. No. There is a possibility of a 42-inch gas line under the bridge. Post Design Services will be by separate Agreement. Orders Construction
The work may consist of inspection, sampling and reports. It is anticipated that appropriately accredited and qualified inspectors, Levels I-IV, for the area of assignment will be required.
Randy Owen Family,
Articles W